DESWA carried out the main power connection works for the DUWANG Residential Development and supplied the metering equipment for the building: a complete compact L.V. meter board with fused industrial cut-out, distribution busbars, current transformers and main MCCBs, and a terminated 500A CT meter board with accessories. Tenant meters were tested before the supply was energised.

Scope of works

  • Main power connection works
  • Compact L.V. meter board with fused industrial cut-out
  • Distribution busbars
  • CTs and main MCCBs
  • Terminated 500A CT meter board

Gallery

Meter board installation
Meter board installation
Testing tenant meters before energising
Testing tenant meters before energising
Wiring the meter board
Wiring the meter board
View all 5 photos
Crew at work on the meter board
Crew at work on the meter board
Final dressing and checks
Final dressing and checks